0 1 2 3 4 5 6 0 1 2 3 4 5 6 7 8 9 10 11 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Miscellaneous Generac inverter status registers All devices disabled and DC bus de-energized. Make sure to open all mechanical disconnects and test all connections with electrical meter before servicing equipment. Support local loads and export solar power to the utility grid. Batteries are inactive in Grid Tie mode. Utilize both solar power and battery power to support local loads before exporting surplus solar to utility grid. Battery power will not be exported to the utility grid in Self Supply. Current transformers (CTs) are required for Self Supply Charge batteries from solar only before supporting local loads and exporting to utility grid. Charge batteries with both solar and the utility grid Priority Backup will charge the batteries as fast as possible. Export full capacity, including battery power, to utility grid. Sell mode will cause batteries to discharge to the utility grid Positive is exporting, negative is importing. Reads 0x8000 when CTs are not connected. As measured from CTs As measured from CTs Error status bitfield Internal status register Internal status register Internal status register Internal status register Large pad for future model expansion