0 1 0 1 Basic diagnostics model for understanding power prioritization The average grid voltage as reported by the GSL The grid frequency as reported by the GSL The real power being imported from or exported to the grid as reported by the GSL The reactive power being imported from or exported to the grid as reported by the GSL The export limit for real power based on the volt watt control algorithm The target for real power based on the frequency watt control algorithm The frequency watt control algorithm's active status The target for reactive power based on the watt var control algorithm The target for reactive power based on the volt var control algorithm The reference voltage used to run the volt var algorithm The target for reactive power based on the constant power factor control algorithm The target for reactive power based on the constant reactive power command The limit for real power based on the real power limit The target for real power based on the real power setting The real power command as requested by the GSL The lower limit on real power as requested by the GSL The upper limit on real power as requested by the GSL The active status of the GSL's real power command The reactive power command as requested by the GSL Positive and negative threshold for reactive amps target Reactive amps adjustment from output capacitance Final output reactive amps after adjustments from the GSL, capacitance, and anti-islanding Reactive amps target from GSL Used to determine whether power flows toward or away from REbus Phase 1 component of real power amps reference total - allows us to balance power between the lines Phase 2 component of real power amps reference total - allows us to balance power between the lines Integral form of the reactive amps target Target from divy - total Target from divy - phase 1 component Target from divy - phase 2 component Restricts all combined real and reactive amps from exceeding this limit Negative real power limit for phase 1 Negative real power limit for phase 2 Positive real power limit for phase 1 Positive real power limit for phase 2 Real power target dependent on mode - phase 1 component Real power target dependent on mode - phase 2 component Amps required to reach the real power target - phase 1 component Amps required to reach the real power target - phase 2 component CT target for self supply for phase 1 CT target for self supply for phase 2 CT target for zero export for phase 1 CT target for zero export for phase 2 CT target for zero import for phase 1 CT target for zero import for phase 2 CT target when generator connected for phase 1 CT target when generator connected for phase 2